Quality

Inspection points, recorded per batch.

Film problems are usually found weeks after the roll was used. The checks below exist so that a question can be answered with a record rather than a recollection.

01

Quality management

Incoming, in-process and final inspection are recorded per batch, with a retained sample kept for traceability. Certification documents are confirmed per grade on request.

02

Environmental compliance

RoHS and REACH direction documentation is available for the film range. The applicable declaration depends on the final packaging use, so requirements are confirmed before documents are issued.

03

Third-party testing

Testing is arranged against the standard requested by the customer or the destination market. Reports are issued for the grade and batch concerned rather than in general terms.

Certification and test reports are issued for the grade and destination market concerned. No certification is claimed on this page; documents are confirmed per project.

Inspection sequence

Five checkpoints between substrate and dispatch

  1. 01

    Incoming substrate

    Gauge, width and roll condition checked against the batch record on receipt.

  2. 02

    Adhesive coating

    Coating weight and uniformity monitored through the run, with samples pulled at intervals.

  3. 03

    Slitting & winding

    Width, core and tension checked roll by roll; edge condition inspected before packing.

  4. 04

    Finished roll check

    Appearance, gauge and adhesion verified; each roll labelled with grade and batch.

  5. 05

    Retained sample

    A sample from each batch is kept for traceability against future enquiries.

Documents

What can be issued, and when

Status describes when a document is normally available rather than a claim that it is already held for every grade.

Ask for a specific document
Document register
DocumentScopeAvailability
Quality management system certificateFilm productionOn request
RoHS declarationFilm rangeOn request
REACH statementFilm rangeOn request
Heavy metal test reportPer gradePer batch
Food-contact declarationSelected gradesOn request

Incoming inspection

Five checks worth doing on arrival

  • 01Roll appearance and edge condition before mounting
  • 02Gauge measured at three points across the web
  • 03Adhesive uniformity, looking for a mottled surface
  • 04Trial lamination on the actual board, peeled after cooling
  • 05Batch number, receipt date and trial result filed together
Read the incoming inspection note

Enquiry

Tell us what you laminate.

Board weight, ink coverage, film gauge and machine model are enough to start. We reply with a grade suggestion and a starting temperature for your trial.

Company
Xiamen Zchain Industry Co., Ltd.
Location
Xiamen, Fujian, China

Distributors and OEM label projects: mention your market and annual volume and we will route the enquiry accordingly.

+86 159 5920 0670

Request a Free Sample